Temporary bridge open in Port Bruce

bridgeThe temporary panel bridge connecting the north and south sides of the lakeside village of Port Bruce opened to traffic at about 10:55 a.m. on Monday, Aug. 20. In this photo taken at about 11:45 a.m. that day, a car is seen completing a north-south crossing of the bridge that spans Catfish Creek from Bank Street on the north side to Dexter Line on the south side. (AE/Craig Bradford)

  • George Maurer

    Is it wise and solid enough for the boats and trailers that will want to cross there? Unlikely that dump trucks and transports will be able to use it

    • Michelle

      I live here and have seen several dump trucks pass over it. There is no weight restriction signs.